The quote includes pulling a permit removing old roof shingles inspecting sheeting boards and replacing boards at 50 00 per 4 x8 sheet or 5 00 per board foot installing new drip edge replacing metal flashing on chimney electrical mast flashing new pipe flashing installing new baffled ridge vent and disposing of all debris.
Removing ac for new roof install.
In this article we ll show you how to remove asphalt shingles quickly so you can move on to the more rewarding part of the job laying new shingles.
We ll also show you how to button up the roof by applying new ice and water barrier and felt paper.
The average price range to shingle a 3 000 square foot shake roof is between 5 000 and 12 000 low cost for installation is around 3 600 and high cost is about 120 000 for a single square of roofing 100 square feet the average price is 170 to 400.
Although you can install corrugated metal roofing over shingles for the best foundation it is recommended that all the old roofing be removed.
The national average cost to replace a roof is 7 211 with most homeowners spending between 4 707 and 10 460 roof installation cost ranges from 400 to 550 per square depending on the roof size and materials used in reroofing.
Thanks for telling your story.
Step 4 cut ice and water barrier to about 8 ft.
Don t be intimidated by the toughest part of re roofing the tear off.
Now it is 32 yrs later and i need to remove both roofs and put in a new one.
I too was home for a new roof install and it was a nightmare living threw the noise and they did not do a tear off just a re roof.
The first step is perhaps the most obvious one you have to strip the old roof clean in preparation for installing the new one.
Remove the old roofing.
Expect to spend 1 500 to 3 000 to remove your current roof before installing a replacement.
Roofing over costs around 2 to 3 per square foot as opposed to the average full replacement cost of 4 50 so roofing over a 1 500 square foot roof may only.
Remove the old roof.
Clean the roof with a push broom and remove or pound in any remaining fasteners.
Even if you are just intending to install new flashing and underlayment you must tear off the old roof first.
That was a great story i learned a lot.
Unit stopped blowing cold air in our fifth wheel.
Work at a comfortable steady pace trying not to rip up or carry off too much old roofing at once.
Lengths remove the backing and adhere the sticky side to the roof sheathing along eave edges.
It would cost more to fix then just replace as long we did the reinstall ourselves.